(Li.2) No more rain – time to start constructions.



In December Alexandro made the needed wall and only a lot of winter rain delayed the actual digging down. In January they went down 4 m under the street level and as feared a lot of what they had to move was solid rock.

Nevertheless the solid rock made it possible to save supporting constructions to protect the road. Some extra cost, but also some savings.